Let’s strip this down to first principles and run the numbers.
If anything, your operating costs of ~$100 per passenger are low. Via Rail runs at $193 per passenger, per their 2024 annual report.
Thanks, I wanted to err on the side of caution, but thanks for looking that up. I will amend my piece.
https://media.viarail.ca/sites/default/files/publications/VIA-Rail_Annual-Report_2024.pdf
https://unbekoming.substack.com/p/the-silent-drift-of-western-institutions
I subscribed to you; you are too smart for Substack. I am going through your material. People will realize you were right in about 100 years.
Thanks a lot!
And then of course it is how long this project will take. If it is anything like the eglington lrt, it definitely won’t be in my lifetime.
If anything, your operating costs of ~$100 per passenger are low. Via Rail runs at $193 per passenger, per their 2024 annual report.
Thanks, I wanted to err on the side of caution, but thanks for looking that up. I will amend my piece.
https://media.viarail.ca/sites/default/files/publications/VIA-Rail_Annual-Report_2024.pdf
https://unbekoming.substack.com/p/the-silent-drift-of-western-institutions
I subscribed to you; you are too smart for Substack. I am going through your material. People will realize you were right in about 100 years.
Thanks a lot!
And then of course it is how long this project will take. If it is anything like the eglington lrt, it definitely won’t be in my lifetime.